Viper 640 Class Association Forums

Viper 640 Public Forums => Viper Discussions => Topic started by: Gray Drohan on June 21, 2026, 12:55:06 PM

Title: Jib Halyard Sheave Fastening
Post by: Gray Drohan on June 21, 2026, 12:55:06 PM
I finally got the mast for #223 re-cleared and I'm now re-assembling it.  Unfortunately, it's been so long since I broke it down that I don't recall how the jib halyard sheave was fastened.  The self-tapper is obvious.  But how should I through-bolt the loaded side?  Screw head out?  Screw head inside?  Where should the washer(s) go?  Can I assume that no backing plate is required since it's in a reinforced section of the mast?  I'd appreciate any input, including any pointers regarding the methods for getting it done inside the tube.  Thank you.
Title: Re: Jib Halyard Sheave Fastening
Post by: Tom Miller on June 22, 2026, 10:13:33 AM
Might be time to think about the 2:1 jib halyard update while you are putting things back together.  You could add the stud without increasing the purchase; had to do this down in Sarasota 2-3 years ago as we kept ripping the spinnaker sheave out of the mast, but the technique was the same.  Remember to use some Tef-gel or something similar between the stainless steel bolt and the carbon mast.

https://forum.viper640.org/repairs-maintenance-and-upgrades/21-jib-halyard-how-to/msg20529/#msg20529